Lithium South is developing its Hombre Muerto North Lithium Project. With a 1,583,100 tonne lithium resource (90% measured), LIS is poised to expand the resource with continued drilling.
Production wells are now being installed at the Alba Sabrina and Natalia Maria claim blocks. Process test work and pilot plant construction are underway to allow a Feasiblity Study in early 2024. For further information, Please visit: https://www.lithiumsouth.com/